One of the first things to do after the construction project is drawn is to decide the amount of material to be used. The measurements in the project are calculated automatically and the amount of material to be used is decided. Load cell should be used in the procurement stages in order to supply the material in the right amount and to avoid excessive use. After calculating the required quantities, it will be possible to supply the materials at the right rate with crane scale type load cells.
In the manufacturing processes of the materials used in the construction industry, weight measurements should be made regularly and these measurements should be respected at all stages. Supplying the materials required for production in the right dimensions will facilitate all stages and will enable production in the desired quantity and quality. The way to make these measurements correctly is through the use of load cells. It is possible to measure accurately with load cells that have sensitive weighing feature.
As the elevator is used to carry loads during the construction process, it can also be required for carrying loads and people in buildings. Each elevator has a maximum load that can be lifted. When there is a weight over this amount, the elevator may become inoperable and accidents that cause serious losses may occur. In order to prevent this situation, a warning should be generated when a certain weight limit is exceeded. Therefore, load cell types integrated with alarm systems should be used in elevators.
loadcell
It is extremely important that the load cell used is made of solid material, that it is calibrated and that it gives accurate weight measurements. With the load cell types produced by Kobastar, you can safely and easily measure weight at all stages of your construction projects.
Contact us: +90 332 249 38 15 – sales@kobastar.com
(+90) 549 546 46 70
sales@kobastar.com
sales1@kobastar.com
Fevziçakmak Mah. Ayyıldız Cad.No:103/B Konya / TURKEY